Brick & Stone Veneer Inspection Guide
STANDARDS OF PRACTICE
The International Standards of Practice for inspecting the Exterior is located at www.nachi.org/sop.
Brick Veneer
Brick veneer bonded with Thinset to cement board coated with bonding agent, installed over Tyvek.
Lower Section
Observation

Inadequate clearance from grade: 4” from soil/2” from grade.
No weep screed installed to allow moisture drainage.

Observation

Some bricks have no mortar joint at the inside corner.
​
Observation

Thinset used as mortar.
​
Observation
Brick veneer traps the window frame making removal more complicated and expensive than if it were properly installed.
​
Observation

Improper flashing above the window.

Upper Section
​
Observation

Bricks not cut to the angle of the roof at the sidewall.
​
Observation
Peel and stick left exposed at flashing.
​
Observation
Substrate visible at mortar joints
​
Observation

Vertical joints align.
​
Observation
Joints on adjacent walls do not align at inside corner.
Stone Veneer
​
Lower Section
​
Observation
Inadequate clearance from grade.
​
Observation

Substrate is visible between stones in some areas.
​
Observation
No mortar is installed between stones.
Upper Section
​
Observation

Inadequately sealed behind kickout flashing.
​
Observation

Sidewall cut is not parallel to roof surface.
​
Observation
Sidewall cut exposes cement board and peel & stick flashing.
​
Observation

Substrate visible at inside corner.
​
Observation

Observation
Partially detached stone.
​
Observation
Detached cement board.